Vacancy in Production | Nasik (Maharashtra)
Vacancy in Production | Nasik (Maharashtra)
POSITION :- Production Executive
COMPANY :- DIAGEO India
LOCATION :- Nasik, Maharashtra, India (On-site)
Job Description
AREAS OF RESPONSIBILITYPERFORMANCE MEASURES
(QUANTITATIVE / QUALITATIVE)
1Production
Implement Production Schedule as per the plan
Achieve Order Execution & Annual Production Plan via
resource optimization
Monitor line-wise production output
Report any production-related issues and take corrective actions
Ensure production activities such as packing, sealing,
filling, machine operation etc. are smooth with product
quality as per standards and on time production
Entering & Maintaing production data in SAP
Adherence to procedures w.r.t. safety, quality,
environment& security standards of the Company
Plan Vs Actual
Delivery Reliability
No. of overdue orders
Man-hours lost
Adherence to Inventory Levels
No of Stoppages
2Resource & Materials Management
Report resource capacity and need for allocation
Follow-up with material department for low stock
items
Report status on materials efficiency Accuracy
Adherence to Timelines
3Productivity Management
Co-ordinate for production line maintenance or
downtimes to minimize disruptions to manufacturing
schedules
Update and maintain production, maintenance and
malfunction records
Implement recommend solutions to resolve identified
problems to improve performance
Motion, method & time study to reduce manpower to
the optimum
Productivity Index
Plan Vs Actual 4Continuous Improvement
Implement corrective & preventive actions planned
Ensure production /material flow /housekeeping &
conformance to Health & Safety & Environment
standards, Quality Management as per plan
Participate in regular meetings, shop rounds to ensure compliance of factoy rules/ standards set for
Industrial safety, Environment System to meet Quality & business standards.
Co-ordinate with Maintenance executive as per plan (to reduce down time)
Engage, guide and train workmen to ensure
production delivery is not impacted
Out of box idea to innovate or adopt methodology to
reduce utility consumption
Conducting daily shopfloor tool box talks on safety,
quality & productivity improvement
Plan Vs Actual
OQI
Audit reports
No of reported accidents/ LTAS
No. of man-hours lost